Factory License Under the Factories Act, 1948: Applicability and Process (2026)

A factory licence under the Factories Act, 1948 is mandatory for any manufacturing premises employing 10 or more workers with power-driven machinery, or 20 or more without, and covers worker safety, health, and welfare standards enforced by the state's Chief Inspector of Factories. The licence must be renewed periodically and displayed at the factory premises, with non-compliance attracting both penalties and potential closure of operations.

Priyanka WadheraPriyanka Wadhera
Published: 19 Nov 2026
10 min read
Factory License Under the Factories Act, 1948: Applicability and Process (2026)
1
2
3
4
5
6
7
8
9
10
11
12

A 2026 guide to the factory licence under the Factories Act β€” worker/power thresholds, Chief Inspector approval, plan sanction, documents, fees and renewal.

Factory License Under the Factories Act, 1948: Applicability and Process (2026)

Any manufacturing premises in India that crosses certain worker or power-usage thresholds is legally a "factory" under the Factories Act, 1948 β€” and every factory must hold a valid licence from the state's Chief Inspector of Factories before it can commence manufacturing. This is one of the most misunderstood licences among growing manufacturers, because the applicability test is not about the size of the company but about the specific worker count and whether power is used in the manufacturing process.

Getting this wrong is costly: operating an unlicensed factory can lead to stoppage orders, penalties, and personal liability for the occupier and manager. This guide explains what counts as a factory, the applicability thresholds, the step-by-step licensing process, documents, indicative 2026 fees, timelines, renewal, and the pitfalls that commonly delay approval.

What Is a Factory License

The Factories Act, 1948 is a labour welfare and workplace-safety statute enacted to regulate working conditions, safety, health, and welfare of workers employed in manufacturing premises. A factory licence, issued under the Act by the state's Chief Inspector of Factories (also called Director of Industrial Safety and Health or a similarly named authority depending on the state), is the formal permission that certifies the premises, machinery, and safety arrangements meet the standards prescribed under the Act before manufacturing activity begins.

Unlike a trade licence, which is a municipal civic permission, a factory licence is a state labour-department approval focused squarely on worker safety β€” fire exits, ventilation, machine guarding, effluent and waste handling, canteen and welfare facilities (for larger units), and safe working load limits on structures, among other things.

Applicability: When Does a Premises Become a "Factory"

Under Section 2(m) of the Act, a premises is treated as a factory if it satisfies the following broad thresholds (note that some states have amended these numbers through state amendments, so the applicable threshold in a given state should always be confirmed):

  • With the aid of power: a manufacturing process is carried on with the aid of power, and 10 or more workers are or were working on any day in the preceding 12 months.
  • Without the aid of power: a manufacturing process is carried on without power, and 20 or more workers are or were working on any day in the preceding 12 months.

"Manufacturing process" is defined broadly under the Act and covers making, altering, repairing, ornamenting, finishing, packing, oiling, washing, cleaning, breaking up, demolishing, or otherwise treating or adapting any article or substance with a view to its use, sale, transport, delivery, or disposal β€” as well as generating, transforming, or transmitting power, and composing types for printing. This means the definition can capture premises that don't look like a traditional "factory" at first glance, such as certain large-scale printing units, packaging operations, or assembly workshops.

Several states have raised these worker thresholds through amendments (some states now apply higher numbers for power and non-power units), so a business close to the boundary should verify the exact applicable figure for its state rather than relying on the central Act's base numbers alone.

Who Needs a Factory License

  • Manufacturing units, assembly plants, and processing facilities that meet or exceed the applicable worker threshold with power-driven machinery
  • Larger manual/artisanal manufacturing operations without power that cross the higher worker threshold
  • Packaging, printing, and finishing operations that fall within the statutory definition of "manufacturing process"
  • Units generating or transforming power as part of their operations
  • Food processing, textile, engineering, chemical, and general manufacturing businesses expanding beyond the small-workshop stage
  • Any premises where manufacturing activity is proposed, even before hiring reaches the threshold, if the entity anticipates crossing it shortly and wants plan approval in place before construction/fit-out

Step-by-Step Process to Obtain a Factory License

  1. Confirm applicability β€” verify against your state's specific worker/power thresholds whether your premises qualifies as a factory under the Act.
  2. Building and plan approval β€” before construction or major fit-out, submit factory building plans (layout, machinery placement, ventilation, fire exits, effluent disposal) to the Chief Inspector of Factories' office for approval; this stage is often called "plan approval" or "consent for construction" and is distinct from the operating licence itself.
  3. Complete construction/fit-out as per approved plans β€” deviations from the sanctioned plan are a common cause of rejection at the inspection stage.
  4. Apply for the factory licence β€” file the application (commonly Form 2 under the Act, though state rules may prescribe their own forms) along with the prescribed fee, providing details of the occupier, manager, manufacturing process, machinery, and expected worker strength.
  5. Site inspection — a Factory Inspector visits the premises to verify structural safety, machine guarding, fire-fighting arrangements, ventilation and lighting, drinking water and sanitation facilities, first-aid provisions, and (for larger units) canteen, crèche, and welfare facilities as applicable to the worker count.
  6. Query resolution β€” respond to any deficiency notice, which commonly relates to missing safety certifications (such as pressure vessel or lift certification, where relevant), inadequate fire exits, or incomplete welfare facilities.
  7. Grant of licence β€” once compliance is confirmed, the Chief Inspector issues the factory licence specifying the maximum number of workers permitted, the manufacturing process approved, and the licence's validity period.
  8. Display and registers β€” the licence must be displayed at the factory premises, and the occupier must maintain statutory registers (attendance, wages, accidents, health, and safety records) as prescribed under the Act.
  9. Ongoing compliance and periodic inspections β€” factories remain subject to periodic inspection by the Factory Inspectorate throughout the licence's validity.

Documents Required

  • Identity and address proof of the occupier (the person with ultimate control over the factory, often a director or partner) and the factory manager
  • Constitution documents of the entity β€” Certificate of Incorporation and MOA/AOA, partnership deed, or proprietorship proof, as applicable
  • Ownership or lease document for the factory premises
  • Site plan, building plan, and machinery layout, duly approved at the plan-sanction stage
  • List of machinery with horsepower/kilowatt ratings, relevant where the "with power" threshold applies
  • Details of the manufacturing process proposed to be carried on
  • Proof of fire safety clearance/NOC from the local fire department
  • Pollution control board consent (Consent to Establish/Operate), where the manufacturing activity falls under regulated categories
  • Details of expected worker strength, shift patterns, and welfare facilities provided
  • Board resolution or authorisation letter naming the occupier and manager for the purpose of the Act
  • Boiler/pressure vessel certification, lift licence, or other equipment-specific certificates, where applicable

Fees for Factory License (Indicative, 2026)

Factory licence fees are prescribed under each state's Factories Rules and are generally structured on a slab basis linked to the number of workers employed and/or the horsepower of installed machinery; they are revised periodically by state notification. As a broad, hedged planning range for 2026:

  • Small units just above the applicability threshold (in the 10–50 worker range) typically fall in a lower fee slab, often a few thousand rupees for the licence, with plan-approval fees charged separately at an earlier stage.
  • Mid-sized units (roughly 50–250 workers, or higher horsepower machinery) move into progressively higher fee slabs, which can run into tens of thousands of rupees depending on the state.
  • Large manufacturing units with substantial worker strength or high-capacity machinery attract the highest slab fees, and may also need to budget for renewal fees calculated on a similar slab basis each cycle.
  • Professional/consultancy fees for plan approval, documentation, and liaison with the Inspectorate are typically charged separately from the statutory government fee, and vary with the complexity of the project.

Because fee slabs differ meaningfully across states and are revised over time, always confirm the current schedule with the relevant state Factories Rules before finalising a budget.

Timeline

  • Plan approval stage: commonly takes a few weeks to a couple of months, depending on the complexity of the building/machinery layout and the state's processing load.
  • Licence grant after construction/fit-out: typically another few weeks once the inspection is conducted and any deficiencies are resolved.
  • Overall, from initial plan submission to final licence grant, businesses should reasonably plan for a timeline spanning a couple of months at the shorter end, extending further for larger or more complex manufacturing setups requiring multiple NOCs (fire, pollution, boiler).

Renewal of Factory License

  • Factory licences are typically issued for a period defined under state rules, commonly with annual renewal being the norm in several states, though some states now permit multi-year validity (often up to a small number of years) against a correspondingly higher fee.
  • Renewal applications should be filed within the prescribed window before expiry β€” commonly a specified number of days ahead β€” to avoid a late fee or an interruption in the ability to lawfully operate.
  • Renewal typically requires confirmation of continued compliance with safety and welfare provisions, updated worker-strength details, and payment of the applicable renewal fee.
  • Any material change β€” increase in worker strength beyond the licensed limit, addition of new machinery, or expansion of the manufacturing process β€” generally requires an amendment to the existing licence rather than being covered automatically under a routine renewal.

Common Pitfalls to Avoid

  • Miscalculating worker count β€” some businesses undercount workers by excluding contract or temporary staff on the payroll on any given day, when the Act's threshold test counts anyone working, not just permanent employees.
  • Skipping the plan-approval stage β€” starting construction without prior plan sanction is a common and costly mistake, since non-compliant layouts often require rework.
  • Missing fire and pollution NOCs β€” these are frequently prerequisites for the factory licence itself, not optional add-ons, and their absence is a leading cause of delayed grant.
  • Operating beyond the licensed worker limit β€” a factory licence specifies a maximum permissible worker count; exceeding it without amending the licence is a compliance breach.
  • Ignoring welfare facility requirements β€” canteen, crΓ¨che, rest rooms, and first-aid provisions become mandatory once specific worker-count thresholds under the Act are crossed, and are commonly overlooked by growing units.
  • Letting the licence lapse β€” a lapsed factory licence effectively means the unit is operating without lawful authority, exposing the occupier to penalties and potential closure directions.
  • Not updating the licence for new machinery or processes β€” adding new manufacturing lines or higher-horsepower machinery without informing the Inspectorate can trigger compliance issues during inspection.

FAQs

1. Does a small workshop with 8 workers using power-driven machinery need a factory licence?

Generally no, since the commonly applicable threshold for power-aided manufacturing is 10 or more workers, but this must be checked against the specific state's amended threshold, as some states have revised the numbers.

2. Is plan approval the same as the factory licence?

No. Plan approval is an earlier-stage sanction of the building and machinery layout before construction/fit-out, while the factory licence is the operating permission granted after the premises is built and inspected.

3. Who is legally responsible if a factory operates without a valid licence?

The "occupier" β€” generally the person with ultimate control over the factory's affairs, often a director or designated partner β€” along with the factory manager, can be held liable under the Act for operating without a valid licence.

4. Do all states apply the same worker thresholds for factory applicability?

No. While the Factories Act sets base thresholds of 10 (with power) and 20 (without power) workers, several states have amended these figures through state-specific rules, so the applicable number can differ by location.

Yes, in most cases. Manufacturing units, particularly those in specified categories, generally need Consent to Establish and Consent to Operate from the State Pollution Control Board, which is often a prerequisite document for the factory licence itself.

6. How often must a factory licence be renewed?

This depends on the state β€” many states require annual renewal, while others now offer multi-year validity for a higher fee; the specific state's Factories Rules will confirm the applicable cycle.

7. Can the factory licence be amended if worker strength increases significantly?

Yes, an amendment application is generally required when worker strength, machinery, or the manufacturing process changes materially from what was originally licensed, so the licence continues to reflect actual operations.

8. What welfare facilities become mandatory once a factory is licensed?

Depending on worker count thresholds under the Act, requirements can include drinking water, washing facilities, rest rooms, canteens, first-aid boxes, and crèche facilities, among others, scaling up with the size of the workforce.

For 14 years we have taken founders end-to-end β€” from choosing the right structure and incorporating, to first-year compliance, funding readiness, and ongoing ROC/GST/tax filings β€” so you never have to switch providers as you grow.

  • One team for the whole journey β€” start, launch, post-launch and every annual filing after.
  • Fixed, all-inclusive pricing β€” professional plus government fees itemised, no hidden charges.
  • A dedicated CA/CS who owns your case and does not disappear after payment.
  • 6,000+ founders served, 4.9/5 rating, DPIIT-recognised, 100% online.

Talk to a Legal Suvidha expert today for a free consultation and an exact, transparent quote on WhatsApp (8130645164).

Frequently Asked Questions

At what employee count does a factory licence become mandatory?
A factory licence is required when a manufacturing unit employs 10 or more workers using power, or 20 or more workers without power, on any day in the preceding 12 months.
Who issues the factory licence?
The factory licence is issued by the Chief Inspector of Factories or the equivalent state labour department authority.
Is factory licence renewal mandatory every year?
Yes, factory licences are generally renewed annually or as prescribed by the state's factory rules, with a renewal application due before expiry.
Does a factory need separate fire and pollution NOCs before getting a factory licence?
Yes, most states require fire safety and pollution control NOCs as prerequisite approvals before a factory licence can be granted.
Priyanka Wadhera
Content Reviewed By

CA | POSH Consultant | Financial Advisor

"I help startups and mid-sized businesses scale by streamlining their tax advisory, POSH compliances, and virtual CFO systems with 100% precision."

Share this article:

Related Posts

View All